AI datacenter engineering

More compute per megawatt, at a risk you set.

We model your AI datacenter as one stochastic system: software, servers, power, cooling and supply chain. Investors, AI clouds, developers and hyperscalers see the expected cost, the tail risk and the energisation date before committing capital.

Book a scoping call

P90P50P10decision todayhorizon →ILLUSTRATIVE · SYNTHETIC P10–P90 FAN

Photo: data hall, Pi Data Centers, Amravati, India. PiDatacenters, CC BY-SA 4.0, via Wikimedia Commons; greyscale, overlaid.

The offer

Model the entire software–hardware stack. Optimise it under the risk you set.

We encode the software, servers, power, cooling and supply chain together with their key uncertainty sources, and run a large-scale optimiser. You get the optimal operating and design points under conservative, balanced or aggressive risk profiles, before capital is committed. Built for AI datacenters; the same method applies to other complex systems.

How it works

  1. 01
    Model the stack

    Software, servers, power, cooling and supply chain as one system.

  2. 02
    Characterise uncertainty

    Lead times, failures, load and weather as distributions, not single numbers.

  3. 03
    Optimise at scale

    A large-scale optimiser traces the efficient frontier of expected cost and tail risk.

  4. 04
    Choose your risk profile

    Conservative, balanced or aggressive: each point on the frontier is a stated tail.

    See an illustrative decision memo →

1041121201281369096102108112E[TCO] (index)CVaR0.95 (index)AggressiveBalancedConservativedominated designs →
Illustrative Risk–cost frontier. Three points on the same design space, selected by the risk profile. Synthetic data.
Illustrative · toy model, not a result

Explore the risk knobs

Adjust service, power, hardware, supply-chain and finance constraints to see how the recommended point shifts on the frontier. Deterministic in-browser toy model; nothing is sent or stored.

01 · Service

QoS / p99 latency SLO
Uptime target (Tier II–IV)

02 · Power & thermal

Grid energisation confidence
Power redundancy

03 · Hardware

HBM / NIC / optics failure

04 · Supply chain

Lead-time risk tolerance

05 · Finance & risk appetite

CVaR confidence α

Illustrative frontier point

Balanced preset
E[TCO] index
100.0
CVaR (0.95) index
115.0
P(on-time energisation)
0.78
Expected goodput
94.2%

Binding constraints

All constraints inside ε

Toy model for illustration only — Balanced = 100 E[TCO], 115 CVaR, not measured site data.

See the mathematical formulation →

Four practice areas

Where the uncertainty sits, and what we price.

It sits in the workload, the software, the hardware and the supply chain — and couples into cost, schedule and goodput.

IllustrativeFigureWhere uncertainty sits in an AI system stack, and how it couples into cost, schedule and goodput. Tag shading is a qualitative judgement of influence, not a measurement. Click a layer to open the practice area that models it.
Cray XE6 cabinets, Blue Waters supercomputer, NCSA.
Cray XE6 cabinets, Blue Waters supercomputer, NCSA. Photo: Stevek ncsa, CC BY-SA 3.0, via Wikimedia Commons; converted to greyscale.

01Optimiser

Joint software-hardware optimization of datacenters

Uncertain
GPU failures, job interruptions, training power swings.
We quantify
Goodput per MW, checkpoint interval, spares per pod.
Blue Waters main data hall before IT installation, 2010.
Blue Waters main data hall before IT installation, 2010. Photo: Daniel Schwen, CC BY-SA 4.0, via Wikimedia Commons; converted to greyscale.

02Model

Stochastic modeling and optimization

Uncertain
Load, weather, failures and lead times, all at once.
We quantify
Expected cost, its tail (CVaR) and P[miss] against your risk budget.
4.16 kV distribution switchgear.
4.16 kV distribution switchgear. Photo: Rsparks3, CC0 1.0, via Wikimedia Commons; converted to greyscale.

03Driven by the model

State of the art software, server, electrical, mechanical concept design

Uncertain
Cooling margin at 100 kW+ racks; reserve power left idle.
We quantify
P[thermal excursion] per year; usable reserve capacity.
Substation transformer, Muurame, Finland.
Substation transformer, Muurame, Finland. Photo: Antti Leppänen, CC BY 4.0, via Wikimedia Commons; converted to greyscale.

04Feeds the model

Supply chain risk integration

Uncertain
Transformer and switchgear lead times; the grid energisation date.
We quantify
P[energised by target date]; the critical-path items.

Every answer is a distribution: expected value, tail, and P[miss]. See an illustrative result →

Engagements

Three engagement sizes, one model.

Same model, three depths: a fast risk scan, a full optimisation study, or an ongoing scenario simulation (simulation only).

Compare sizes →
  1. T1Fast risk scan≈ 4 weeksYour planned AI hall, scored for tail risk before you build.
  2. T2Full optimisation study≈ 8–12 weeksThe software–hardware stack, jointly optimised under your risk profile.
  3. T3Ongoing scenario simulationOngoing · periodicThe same model, re-run when plans, hardware or suppliers change. Simulation only.

Fixed scope and fee, agreed at scoping, on the design documents and inputs you send.

Have a power, cooling or schedule decision on the table?

Book a scoping callAbout Hermitian Consulting →