The four practice areas, each as what we model, the key uncertainties, and what the optimiser returns. Then condensed notes. Published figures are cited; illustrative marks worked examples.
The stack
Where uncertainty in AI systems resides.
A qualitative map of the sources we put into the model. Tag shading is a judgement of influence, not a measurement.
IllustrativeFigureWhere uncertainty sits in an AI system stack, and how it couples into cost, schedule and goodput. Tag shading is a qualitative judgement of influence, not a measurement. Click a layer to open the practice area that models it.
Practice areas
What we model, where the uncertainty sits, and what the optimiser returns.
Four blocks, one for each practice area. Layers on the map above jump here.
Illustrative · qualitative
Bar length is a judgement of influence on the objective, not a measurement. The same sources appear in the map above and in the blocks below.
01
Joint software-hardware optimization
Uncertain
GPU failures, job interruptions, training power swings.
We quantify
Goodput per MW, checkpoint interval, spares per pod.
What we model
Scheduler, accelerators and plant as one system: placement, caps, clocks and checkpoints, simulated against UPS headroom, CDU and facility-water capacity, and thermal ride-through.
Key uncertainty sources
Demand mix, model-size growth and job failures; utilisation, checkpoint overhead and goodput; GPU failure rates, thermal throttling and power-draw variance.
What the optimiser outputs
Co-design specification: signals and levers, sized by simulation
Oversubscription and capping policy, per failure domain
Training power-shaping: floors, staggered checkpoints, storage
Thermal-headroom envelope for sustained boost
02
Stochastic modeling & optimization
Uncertain
Load, weather, failures and lead times, all at once.
We quantify
Expected cost, its tail (CVaR) and P[miss] against your risk budget.
What we model
Growth, accelerator power, climate, failures, prices and delivery dates as distributions. Monte Carlo and reliability models, then chance-constrained, two-stage programs over them.
Key uncertainty sources
The coupled sources across every layer of the stack — the map above. Uncertainty is not isolated: it propagates into cost, schedule and goodput.
What the optimiser outputs
P50 / P90 / P99 envelopes for power, cooling and water
Availability, MTTR, spares and SLA exposure
min E[TCO] + λ·CVaRα subject to P[excursion] ≤ ε
The auditable simulation model, documented and handed over
Cooling margin at 100 kW+ racks; reserve power left idle.
We quantify
P[thermal excursion] per year; usable reserve capacity.
What we model
Concepts for 100 to ~600 kW racks — cold plate or two-phase immersion (2PIC), AC or 800 VDC, W-class — parameterised and scored together on expected cost and tail risk.
Key uncertainty sources
Rack density; fabric congestion and optics failures; heat rejection, ambient conditions and liquid or immersion capacity; grid-connection timing as a design constraint.
What the optimiser outputs
Concept basis across all four disciplines
Single-line and heat-rejection concepts for rack, row and hall
Technology selection with quantified trade-offs
Acceptance criteria and test plans for detailed design
04
Supply chain risk integration
Uncertain
Transformer and switchgear lead times; the grid energisation date.
We quantify
P[energised by target date]; the critical-path items.
What we model
Lead times, sourcing concentration and regulatory exposure (for example PFAS fluids) as distributions, so every design choice carries its delivery risk.
Key uncertainty sources
Transformer and switchgear lead times; vendor concentration; the grid energisation date.
What the optimiser outputs
Supply-risk register per BOM line
Schedule-risk simulation: P(energisation by date)
Design for substitution and second source
Procurement inputs: early release, buffers, spec flexibility
Risk profiles
The same design space, three points on the frontier.
Choose a profile to see how the optimiser’s recommended point moves, and which example design choices sit there. Numbers are synthetic.
Illustrative · synthetic
Synthetic numbers for a generic hall, not from any client or project. A real frontier is built from the documents and risk budget you set.
Method
A two-stage, chance-constrained programme over the stack.
Every engagement solves a programme of this form. The depth changes with the tier; the structure does not. The symbols are standard and no site data is shown.
Decision stages
Let x be the here-and-now design (cooling technology, W-class, redundancy, oversubscription, procurement releases, checkpoint and cap policy). Uncertainty is a random vector ξ of IT load and training swings, device failures and MTTR, ambient conditions, prices, and lead times. After ξ is realised, a recourse action y(ξ) is chosen (capping, shedding, chiller trim, flow, restarts).
λ ≥ 0 is the risk appetite agreed at scoping. CVaRα is the expected tail of TCO beyond the α-quantile; it has a standard linear programming representation (Rockafellar–Uryasev) and does not require a non-linear tail oracle.
The risk budget (εP, εT, εG, εS) is part of the brief. Constraints may be imposed as empirical frequencies on the sample or as CVaR surrogates when a tail formulation is tighter to enforce.
Scenario generation
Scenarios ξ1 … ξN are drawn by Monte Carlo from distributions fitted to the documents you send, published field data, and quoted lead times. An assumption register records every fitted or assumed law. Optional scenario reduction keeps the tail events that drive CVaR and the chance constraints. The programme is a sample-average approximation (SAA); we report the in-sample objective and, where useful, an out-of-sample check on a held-out draw.
Solver and decomposition
The extensive form (SAA with explicit second-stage copies) is used when N and the design dimension allow. Larger instances are decomposed with an L-shaped / Benders scheme: a master problem on x and CVaR auxiliaries, and subproblems on y(ξn) per scenario or per bundle. Integer first-stage decisions (technology, topology) are handled in the master. We do not require a connection to your systems; the programme is solved on the model built from the design documents and inputs you provide.
IllustrativeFigureSchematic of the programme. The first-stage design x is chosen before uncertainty is realised; second-stage recourse y(ξ) is chosen in each scenario. Not a client result.
NOTE 01
Heat flux, not TDP, sets the cooling regime
DecisionWhich cooling regime a part needs, and how warm the coolant can run.
TDP sets the watts. Peak die heat flux and Tj,max set the technology.
Illustrative: 1,000 W at 40 °C coolant and Rj-fluid = 0.045 °C/W gives Tj ≈ 85 °C. Each 0.01 °C/W saved is 10 K of margin: warmer water, higher clocks or lower leakage.
Figure 1Rack power by AI platform, approximate public figures (DCD, Tom's Hardware, Mar 2025). Kyber-class is a roadmap figure.
See UC 02 · Ramakrishnan et al., IEEE TCPMT 2021, doi
NOTE 02
Two-phase immersion: the thermodynamics that matter
DecisionWhether tank and condenser are sized for the vapour load, and the facility-water temperature that allows.
Latent heat sets the vapour flow; the condensate film sets the condenser.
ṁ_vapour = Q / h_fg
Q_cond = U · A · ΔT_lm (condensate-film limited)
T_sat − T_FWS,in = ΔT_approach → caps facility-water temperature
Near-isothermal surfaces at Tsat + ΔTsuperheat; boiling-enhancement coatings raise CHF.
Film resistance: a 10 kW rig condensed well below ε-NTU sizing; measured film thickness explained the gap.
Production reference: 38U tank, 17.4 kW, 1+1 condensers (OCP 2021).
DecisionWhich dielectric fluid, and the fallback if regulation changes.
Fluid choice fixes Tsat, and with it facility-water temperature and regulatory risk.
Fluorinated two-phase fluids sit in the PFAS debate: 3M announced its exit from PFAS manufacturing by end-2025; an EU-wide restriction has been proposed under REACH.
We score Tsat, dielectric and material compatibility, GWP, second source and a mid-life fallback design.
Note: regulation moves. We re-check fluid status at the start of each engagement.
NOTE 05
Designing to ASHRAE TC 9.9 envelopes
DecisionWhich supply-temperature class for the facility-water system.
Air: recommended 18–27 °C inlet. Liquid: W-classes W17 to W+, named for maximum facility-water supply.
Warmer W-class: more economiser hours, less ΔT left for the cold-plate stack.
Figure 2Heat-rejection path for a direct-to-chip rack at a W32 design point. Illustrative values.
ASHRAE TC 9.9 thermal and liquid-cooling guidelines; confirm against the current edition.
NOTE 06
Power: stranded watts and training swings
DecisionHow far to oversubscribe, and how much storage to buy for training swings.
Reserved power is idle capacity. Synchronous training makes the swing itself a design load.
Illustrative: a 20 MW provisioned hall at ρ = 10% carries 22 MW of allocated IT. If draw exceeds the cap in 0.5% of hours, that is ≈ 44 capped hours a year. Raise ρ while the extra MW earn more than the extra capped hours cost, and only while critical workloads stay within ε.
Figure 3Illustrative training power trace (not measured). Dashed: shaped profile.
DecisionWhich efficiency metric enters the objective.
Remove server fans and PUE can rise while total energy falls. Report TUE.
PUE = E_facility / E_IT TUE = PUE × ITUE ITUE = E_IT / E_compute
WUE = L_site_water / kWh_IT
Illustrative: 100 kW of IT at PUE 1.20 draws 120 kW. Remove 8 kW of server fans with liquid cooling and keep 20 kW of facility overhead: IT falls to 92 kW, total to 112 kW (−6.7%), yet PUE rises to 1.22. Optimise total energy per unit of compute, not PUE.
Illustrative: design A has E[TCO] = 100 and CVaR0.95 = 118; design B has 97 and 131. With λ = 0.3, A scores 135.4 and B 136.3: A wins despite the higher mean, because B’s bad scenarios are worse. λ is set with you, before the numbers are run.
Illustrative: N = 16,384 accelerators at 50,000 h MTBF each gives Mcluster ≈ 3.1 h. With δ = 2 min to write a checkpoint and R = 10 min to restart, τ* ≈ 27 min and goodput ≈ 80%. Halving δ lifts it to ≈ 84%. Spares, failure domains, storage bandwidth and power floors all move these terms, so we size them together.
IllustrativeGoodput calculatorFirst-order model above. Runs in your browser; nothing is sent or stored.
Mcluster
τ* (Young)
Goodput at τ
Goodput at τ*
See UC 03 · Young, Commun. ACM 1974, doi · Daly, Future Gener. Comput. Syst. 2006, doi